
ESP32 controlled lamp
A half-inch steel base, a welded conduit neck, and an ESP32 streaming 28 lighting effects over Wi-Fi at 60 FPS.
- ESP32
- C++
- UDP
- Welding
- 3D printing
Projects
Every page goes deeper than the resume: how it was built, why it works, and code where there is code. Two are still in progress.

A half-inch steel base, a welded conduit neck, and an ESP32 streaming 28 lighting effects over Wi-Fi at 60 FPS.

Built from propane tanks, with the firebox joint cut from a computed surface intersection. Built for $3,500, sold for $12,000.
A Transformer forecasting ~325 stocks every minute, a real-time C++ engine, and a Kalman-filter and QP portfolio layer, traded live.
Undergraduate research with Dr. Masood Amin on a drone that flies, drives, and dives. I'm designing the electrical system.
A PID-controlled chamber holding 65 °F, 90% humidity, and 650 ppm CO₂ for growing lion’s mane mushrooms.
No projects match that filter yet.